Keith Woolford Posted May 23, 2019 Posted May 23, 2019 (edited) Construction in preparation for a new 200 foot steel bridge over the Caldera River at Bajo Mono has begun. The old bridge will will be closed for the duration. There is an alternate route to Horqueta and the Quetzal Trail via Alto Quiel. Edited May 23, 2019 by Keith Woolford Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.